The presentation "Wonders of the Fall Sky" will take place at 7:30pm tonight; the speaker is Education Curator Amy Brouillette.

Below is the NOAA forecast for HRPO's viewing time of 8:30pm to 10pm...
precipitation potential, 13%
sky cover, 63%
relative humidity, 84%
temperature, 24˚C
surface wind, E 11 km/h


Danko's Clear Dark Sky states that during HRPO's viewing time both the transparency rating will be "poor" (1 out of 5) and the seeing rating will be average (3 out of 5). This evening's 20OGS operator was to be BRAS member Marvin Owen. However, the 20OGS and 16OGS telescopes are currently undergoing maintenance. Telescope viewing will take place at the front viewing pad. HRPO will close at 10pm.

The 6 October 2017 rating is...
EXCELLENT
VERY GOOD
GOOD
FAIR
POOR
BAD


Top
 Profile  
 
PostPosted: October 7th, 2017, 12:37 pm 
Offline

Joined: October 12th, 2009, 3:28 pm
Posts: 3814
Location: Baton Rouge, LA
Due to possible tropical storm conditions, HRPO will be closed tonight. HRPO personnel asks that the general public do not occupy the facility's parking lot or grounds after 1pm today.


Top
 Profile  
 
PostPosted: October 13th, 2017, 5:46 pm 
Offline

Joined: October 12th, 2009, 3:28 pm
Posts: 3814
Location: Baton Rouge, LA
The presentation "Space Law" will take place at 7:30pm tonight; the speaker is JD candidate Zach Miller, currently studying at the Paul Hebert Law Center.

Below is the NOAA forecast for HRPO's viewing time of 8:30pm to 10pm...
precipitation potential, 2%
sky cover, 6%
relative humidity, 74%
temperature, 25˚C
surface wind, E 5 km/h


Danko's Clear Dark Sky states that during HRPO's viewing time the transparency rating will be "above average" (4 out of 5) and the seeing rating will be "good" (4 out of 5). This evening's 20OGS operator was to be BRAS member Peter Lazar. However, the 20OGS telescope is currently undergoing maintenance. Telescope viewing will take place at the front viewing pad, and possibly with the 16OGS. An Atlas Centaur D upper stage is predicted to make a magnitude 2.5 pass beginning at 8:51pm. HRPO will close at 10pm.

The 13 October 2017 rating is...
EXCELLENT
VERY GOOD
GOOD
FAIR
POOR
BAD


Top
 Profile  
 
PostPosted: October 14th, 2017, 4:46 pm 
Offline

Joined: October 12th, 2009, 3:28 pm
Posts: 3814
Location: Baton Rouge, LA
HRPO will have its main floor set up for patrons by 7pm. Stage three of China's Changzheng 3 is predicted to make a magnitude -0.5 pass beginning at 7:04pm.

Below is the NOAA forecast for HRPO's viewing time of 7:30pm to 10pm...
precipitation potential, 7%
sky cover, 22%
relative humidity, 67%
temperature, 25˚C
surface wind, E 9 km/h


Danko's Clear Dark Sky states that during HRPO's viewing time the transparency rating will be "above average" (4 out of 5) and the seeing rating will be "average" (3 out of 5). This evening's 20OGS operator was to be BREC Nighttime Center Supervisor Jordan Cobbs. However, the 20OGS' operating computer is currently being serviced by LSU. Viewing will take place with either a portable telescope or the 16OGS. The International Space Station is predicted to make a magnitude -2.9 pass beginning at 8:04pm. HRPO will close at 10pm.

The 14 October 2017 rating is...
EXCELLENT
VERY GOOD
GOOD
FAIR
POOR
BAD


Top
 Profile  
 
PostPosted: October 20th, 2017, 6:03 pm 
Offline

Joined: October 12th, 2009, 3:28 pm
Posts: 3814
Location: Baton Rouge, LA
The presentation "GOES-16 Satellite" will take place at 7:30pm tonight; the speaker is meteorologist Jesse Gunkel.

Below is the NOAA forecast for HRPO's viewing time of 8:30pm to 10pm...
precipitation potential, 9%
sky cover, 68%
relative humidity, 73%
temperature, 25˚C
surface wind, E 13 km/h


Danko's Clear Dark Sky states that during HRPO's viewing time the transparency rating will be "too cloudy to forecast" (0 out of 5) and the seeing rating will be "average" (3 out of 5). This evening's 20OGS operator was to be LSU physics professor Rob Hynes. However, the 20OGS telescope is currently undergoing maintenance. Telescope viewing will take place at the front viewing pad, and possibly with the 16OGS. HRPO will close at 10pm.

The 20 October 2017 rating is...
EXCELLENT
VERY GOOD
GOOD
FAIR
POOR
BAD


Top
 Profile  
 
PostPosted: October 21st, 2017, 3:09 pm 
Offline

Joined: October 12th, 2009, 3:28 pm
Posts: 3814
Location: Baton Rouge, LA
HRPO's annual Halloween event, The Spooky Spectrum, takes place tonight.

Below is the NOAA forecast for the event time of 6pm to 10pm...
precipitation potential, 39%
sky cover, 75%
relative humidity, 85%
temperature, 25˚C
surface wind, SE 14 km/h


Danko's Clear Dark Sky states that during HRPO's viewing time both the transparency rating and the seeing rating will be "too cloudy to forecast" (0 out of 5). This evening's 20OGS operator was to be BRAS member Peter Lazar. However, there will be no sky viewing and HRPO will close at 9pm.

The 21 October 2017 rating is...
EXCELLENT
VERY GOOD
GOOD
FAIR
POOR
BAD

Through 18 November, we are asking all patrons to bring one dollar per person in support of our annual Donation Drive...
http://hrpo.lsu.edu/programs/drive.html


Top
 Profile  
 
PostPosted: October 27th, 2017, 5:35 pm 
Offline

Joined: October 12th, 2009, 3:28 pm
Posts: 3814
Location: Baton Rouge, LA
The presentation "The Spooky Sampler" will take place at 7:30pm tonight.

Below is the NOAA forecast for HRPO's viewing time of 8:30pm to 10pm...
precipitation potential, 79%
sky cover, 97%
relative humidity, 89%
temperature, 17˚C
surface wind, NW 16 km/h


Danko's Clear Dark Sky states that during HRPO's viewing time the transparency rating will be "too cloudy to forecast" (0 out of 5) and the seeing rating will be "bad" (1 out of 5). This evening's 20OGS operator was to be BRAS member Merrill Hess. However, there will be no sky viewing and HRPO will close at 8:45pm.

The 27 October 2017 rating is...
EXCELLENT
VERY GOOD
GOOD
FAIR
POOR
BAD


Top
 Profile  
 
PostPosted: October 28th, 2017, 4:51 pm 
Offline

Joined: October 12th, 2009, 3:28 pm
Posts: 3814
Location: Baton Rouge, LA
The annual Observe the Moon Night event takes place this evening at HRPO.

Below is the NOAA forecast for the event time of 7pm to 10pm...
precipitation potential, 0%
sky cover, 7%
relative humidity, 59%
temperature, 9˚C
surface wind, N 11 km/h


Danko's Clear Dark Sky states that during HRPO's viewing time the transparency rating will be "average" (3 out of 5) and the seeing rating will be "poor" (2 out of 5). This evening's 20OGS operator was to be BRAS Treasurer Trey Anding. However, both the 20OGS and 16OGS systems are undergoing maintenance. Viewing will be performed on the front viewing pad with two different telescopes.

The Hubble Space Telescope is predicted to make a magnitude 1.4 pass beginning at 7:42pm. A Centaur D rocket body is predicted to make a magnitude 1.9 pass beginning at 7:44pm. Tiangong 2 is predicted to make a magnitude 1.2 pass beginning at 7:48pm. HRPO will close at 10pm.

HRPO will not assign a Rating to tonight's sky viewing time due to disparate data.

Through 18 November, we are asking all patrons to bring one dollar per person in support of our annual Donation Drive...
http://hrpo.lsu.edu/programs/drive.html


Top
 Profile  
 
PostPosted: November 3rd, 2017, 5:40 pm 
Offline

Joined: October 12th, 2009, 3:28 pm
Posts: 3814
Location: Baton Rouge, LA
The presentation "Buying Your First Telescope" will take place at 7:30pm tonight.

Below is the NOAA forecast for HRPO's viewing time of 8:30pm to 10pm...
precipitation potential, 20%
sky cover, 61%
relative humidity, 78%
temperature, 23˚C
surface wind, S 5 km/h


Danko's Clear Dark Sky states that during HRPO's viewing time both the transparency rating and the seeing rating will be "average" (3 out of 5). This evening's 20OGS operator was to be LSU physics professor Greg Stacy. However, telescope viewing will take place at the front viewing pad, and HRPO will close at 10pm. If it begins to rain anytime after 8:30pm, HRPO will close immediately.

The 3 November 2017 rating is...
EXCELLENT
VERY GOOD
GOOD
FAIR
POOR
BAD


Top
 Profile  
 
PostPosted: November 4th, 2017, 4:51 pm 
Offline

Joined: October 12th, 2009, 3:28 pm
Posts: 3814
Location: Baton Rouge, LA
HRPO will have its main floor set up for patrons by 7pm. Below is the NOAA forecast for HRPO's viewing time of 7:30pm to 10pm...
precipitation potential, 8%
sky cover, 40%
relative humidity, 95%
temperature, 23˚C
surface wind, SW 9 km/h


Danko's Clear Dark Sky states that during HRPO's viewing time the transparency rating will be "poor" (1 out of 5) and the seeing rating will be "good" (4 out of 5). This evening's 20OGS operator was to be BREC Nighttime Center Supervisor Jordan Cobbs. However, the 20OGS' operating computer is currently being serviced by LSU. Viewing will take place with a portable telescope. HRPO will close at 10pm.

The 4 November 2017 rating is...
EXCELLENT
VERY GOOD
GOOD
FAIR
POOR
BAD


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 99 posts ]  Go to page Previous  1 ... 6, 7, 8, 9, 10  Next

All times are UTC - 6 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
cron
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group